By default, a model call with no known price is blocked. The cost would be a guess, and a guess breaks a hard budget.
If you need to run such a model anyway, add a price override to the configuration. It is a provisional price that lets budgets still reserve and stop.
Prerequisites
Section titled “Prerequisites”- A team folder with a
nuramesh.yaml(Write a team configuration). - The provider and model name exactly as the role’s
default_modelwrites them (provider/model). - A person’s id for
set_byand a reason you are willing to have in the ledger.
-
Add a
price_overridesentry tonuramesh.yaml:price_overrides:- provider: acmemodel: tiny-1input_per_million: "1.00"output_per_million: "4.00"set_by: human:youset_at: "2026-10-25T12:00:00Z"reason: "Trying the model before its price is published" -
Validate the file:
Terminal window nuramesh validate my-team/nuramesh.yaml
The rules of an override
Section titled “The rules of an override”- Both rates are required. Amounts are decimal text, never numbers.
set_bymust be a person (human:<id>), andreasonexplains why.- Each use of the override is a ledger event naming who set it and when. Costs computed with it are
recorded as
provisional. - Prefer a real, sourced entry in
pricesas soon as you have one. A price has an effective date and asource.
See the field list in the Configuration reference. Money rules: Budgets.
Check it worked
Section titled “Check it worked”nuramesh validate prints my-team/nuramesh.yaml: valid. On the next run, a call to that model is no
longer blocked for its unknown price, and its cost is recorded as provisional.
Troubleshooting
Section titled “Troubleshooting”| You see | Do this |
|---|---|
validate names a path under $.price_overrides |
A field is missing or has the wrong form. Both rates are needed, as text in quotes ("1.00"), and set_by must be human:<id> |
| The call is still blocked for an unknown price | The provider and model of the override do not match the model the role uses. Compare them with the role’s default_model |
Costs are marked provisional |
That is the override at work. Replace it with a sourced entry in prices to end it |
Next steps
Section titled “Next steps”- Budgets: why an unknown price is blocked.
- Set a hard budget: the limit an override lets you keep.
- Costs and savings: how provisional costs are reported.
Was this page helpful?